Property Pole Replacement Booval – Energex Defect Rectification
Property Pole Replacement
The owner of this property in Booval contacted our team after receiving a defect notice from Energex relating to the property’s electrical supply pole.
Following an inspection, Energex determined that the existing property pole was non-compliant because it was surrounded by hard surfaces that prevented safe access to excavate around the base of the pole. This restricted future maintenance and serviceability requirements, resulting in the pole being defected and requiring replacement.

To resolve the issue, Fully Wired coordinated the entire project from start to finish. We engaged a specialist property pole contractor to safely remove and replace the existing pole while ensuring all works complied with current Energex requirements and Australian Standards.
A key part of the project involved liaising directly with Energex to arrange a temporary disconnection of power while the old pole was removed and the new pole installed. Once the replacement was completed, Energex returned to reconnect the electrical supply, restoring power safely and efficiently to the property.
The result was a fully compliant property pole installation that met Energex requirements and eliminated the defect notice. The property owner now has peace of mind knowing their electrical supply infrastructure is safe, accessible and serviceable for years to come.

Location: Booval
Building: Residential Property
Service: Property Pole Replacement and Energex Coordination – Body Corporate Electrical
Cost: $5,900 + GST
This Booval property pole replacement demonstrates Fully Wired’s ability to manage electrical defect rectifications, coordinate with supply authorities and deliver compliant solutions with minimal disruption to property owners.
Need assistance with an Energex defect notice or property pole replacement? Contact Fully Wired Electrical Services today for expert advice and a same-day onsite quote.
