Large Switchboard Upgrade in Toowong

Switchboard Upgrade for complex in Toowong

A custom switchboard upgrade was recently completed at a 23-unit apartment complex in Toowong, addressing critical safety and compliance issues.

A switchboard upgrade usually comprises of the replacement of existing enclosure, circuit protection and electricity meter paneling into a new metallic housing that is compliant to the current standards (AS3000:2018).  The existing switchboard had fallen short of current standards, prompting a full replacement with a custom-built board tailored to the building’s unique layout and load requirements. 
For this particular project, it also involved safe removal of asbestos, discovered during the initial inspection, ensuring the site met modern health and safety regulations.

This comprehensive overhaul not only restored compliance but significantly enhanced the safety and reliability of the building’s electrical system.

Location: Toowong, Brisbane

Size: 23 Unit Brick Complex

Approx Project Cost: $72,000 + GST

the original switchboard with old meters
ORIGINAL NON COMPLIANT SWITCHBOARD

being safe during the switchboard upgrade

SAFETY DURING ASBESTOS REMOVAL 

 

ELECTRICAL WIRING INSIDE A SWITCHBOARD
ELECTRCIAL WIRING
NEW AND FINISHED SWITCHBOARD
COMPLETED SWITCHBOARD UPGRADE

 

 

 

 

 

 

 

 

 

 

Our team provide regular switchboard inspections and safety audits to help identify issues early. Read more here about electrical safety compliance and how we can help!


© 2025 Fully Wired Electrical Services

A Brisbane Website